Important announcement

Dear visitor,

Please note that this OpenCourseWare platform will be replaced at the end of 2026 by a new platform (under the same url ocw.tudelft.nl).

Courses and their contents that are currently available the platform will partly be migrated. URL’s for this content will change and content might be unavailable for some time. In addition, some courses will not be available anymore.

If you are linking to specific courses on this platform (for instance for your students), please take timely measures to avoid problems with access. Possible actions are:

  • Download the materials to your local platform (laptop, server)
  • For educators only (including TU Delft lecturers): Contact us at ocw@tudelft.nl and inform us what course you are using in what context (institute, program, period of use, number of students). We will research (in collaboration with the authors of the course) and decide if we will migrate the course, and if yes, can supply you with a new url.

Thank you.

2.1.5 Preventative maintenance

Here you find a daily preventive maintenance checklist for the ultrasound machine.

Daily checklist:

Cleaning

Wipe dust off exterior and cover equipment after checks

Wipe the probes with alcohol-free tissue or cloth

Visual checks

Check all fittings and accessories are mounted correctly

USG can have a lot of cables- Check cables are not twisted and probe is safely stored

Functional checks

Before use, switch on to one of the modes that we learnt about in the previous section and check if the monitor displays the right image.

 

Based on the daily preventive maintenance checklist make your own weekly checklist. Keep in mind that it should include cleaning, functional and visual checks.

Back to top
[sg_popup id=6]