Important announcement

Dear visitor,

Please note that this OpenCourseWare platform will be replaced at the end of 2026 by a new platform (under the same url ocw.tudelft.nl).

Courses and their contents that are currently available the platform will partly be migrated. URL’s for this content will change and content might be unavailable for some time. In addition, some courses will not be available anymore.

If you are linking to specific courses on this platform (for instance for your students), please take timely measures to avoid problems with access. Possible actions are:

  • Download the materials to your local platform (laptop, server)
  • For educators only (including TU Delft lecturers): Contact us at ocw@tudelft.nl and inform us what course you are using in what context (institute, program, period of use, number of students). We will research (in collaboration with the authors of the course) and decide if we will migrate the course, and if yes, can supply you with a new url.

Thank you.

5.5.1 CasaNova – Rotterdam (The Netherlands)

With this visit to CasaNova in Rotterdam our journey comes to an end. For the last time in this course, watch Dr. Knaack interview Caro van de Venne about the complexity of engineering high rise buildings.

Building: CasaNova
Location: Rotterdam, the Netherlands
Year: Under construction. Estimated completion 2022
Architect: Barcode Architects
Façade engineer: Blitta gevelsystemen
Partner:
 Caro van de Venne, Partner Architect and co-founder of Barcode Architects

High rise buildings

How to develop a complex façade?

 

First idea: design or technology 

Translation to design

Dos and don’ts in process?

How to engineer a complex façade? 

 

High rise building:

Which façade technology?

Right system?

Right material?

 

How to build a complex façade?

 

Find the manufacturer

Logistics

Does it work in the end?

Back to top
[sg_popup id=6]