Important announcement

Dear visitor,

Please note that this OpenCourseWare platform will be replaced at the end of 2026 by a new platform (under the same url ocw.tudelft.nl).

Courses and their contents that are currently available the platform will partly be migrated. URL’s for this content will change and content might be unavailable for some time. In addition, some courses will not be available anymore.

If you are linking to specific courses on this platform (for instance for your students), please take timely measures to avoid problems with access. Possible actions are:

  • Download the materials to your local platform (laptop, server)
  • For educators only (including TU Delft lecturers): Contact us at ocw@tudelft.nl and inform us what course you are using in what context (institute, program, period of use, number of students). We will research (in collaboration with the authors of the course) and decide if we will migrate the course, and if yes, can supply you with a new url.

Thank you.

4.1.3 Reading material: Project Work Breakdown Structure

Course subject(s) 4. Construction and Project Management

Reading Material 4.1

There are many project management tools and techniques that use a WBS as input throughout the project life cycle. To get a better understanding of the Work Breakdown Structure tool, we kindly ask you to read the following article: 

There are different breakdown structures that you can use as a construction or project manager. The following article will give you some examples:

Creative Commons License
Managing Building Adaptation: A Sustainable Approach by TU Delft OpenCourseWare is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Based on a work at https://ocw.tudelft.nl/courses/managing-building-adaptation-a-sustainable-approach/.
Back to top
[sg_popup id=6]