Important announcement

Dear visitor,

Please note that this OpenCourseWare platform will be replaced at the end of 2026 by a new platform (under the same url ocw.tudelft.nl).

Courses and their contents that are currently available the platform will partly be migrated. URL’s for this content will change and content might be unavailable for some time. In addition, some courses will not be available anymore.

If you are linking to specific courses on this platform (for instance for your students), please take timely measures to avoid problems with access. Possible actions are:

  • Download the materials to your local platform (laptop, server)
  • For educators only (including TU Delft lecturers): Contact us at ocw@tudelft.nl and inform us what course you are using in what context (institute, program, period of use, number of students). We will research (in collaboration with the authors of the course) and decide if we will migrate the course, and if yes, can supply you with a new url.

Thank you.

Discrete Nonlinear Precritical Path Equilibrium with Snap-Through

Course week(s) Week 3
Course subject(s) Discrete Structures

This is an applied example for which the precritical path is nonlinear and stable. The postcritical path proves to be unstable, and hence one gets either collapse or snap-through. In the case of this example, there exists another stable equilibrium path for which the load can be increased further, and the solution snaps from the critical point, which proves to be a limit point, to another stable equilibrium branche.

The Lecture Slides

Erreta

The equilibrium path on slide 4 is plotted wrongly for negative values of N. It should in principle be similar to the equilibrium paths plotted later in the lecture.

Creative Commons License
Buckling of Structures by TU Delft OpenCourseWare is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Based on a work at https://ocw.tudelft.nl/courses/buckling-of-structures/.
Back to top
[sg_popup id=6]